Monday, December 9, 2019
Event Logs and Process Models â⬠Free Samples to Students
Question: Discuss about the Event Logs and Process Models. Answer: Introduction Business process model and notification (BPMN) mainly provides the business with the main capability of understanding the internal business procedures in a graphical notation. Furthermost the graphical representation would help more in the understanding of the process which is related to the implementation (Muthusamy, Vinod, et al 2016). There are mainly five stages that can be applied to the concept of the BPMN they are: Design phase: This phase mainly includes the design of the concept taking into consideration the overall working and the aim of the system Modelling phase: Design phase is followed by the modelling phase. This phase mainly includes the overall internal working of the system. Execution phase: This phase includes the execution of the process. Monitoring phase: This refers to the monitoring of the working of the process in order to achieve the desired result which is expected from the implementation. Optimization phase: This mainly include the concept of optimization which mainly include increasing the standard of the working of the process and the utilization of the resources. (van der Aalst, Wil MP 2016). The BPMN 2.0 is considered to be a business process model. The BPMN specification mainly describes. How the elements in the process diagram have to look like (notation)? How the different elements can be combined with each other (meta model / syntax)? What a diagram exactly means (semantics) and How the diagram is mainly transferred from one tool to another tool (XML interchange format) (Kalenkova et al. 2016). BPMN elements summary Events: The events are mainly classified in three types namely start event, intermediate event and end event. Activity: The activity is mainly divided into two parts namely task and sub processes. Gateway: There are mainly five types of gateway. They are exclusive gateway, parallel gateway, inclusive gateway, inclusive gateway, gateway which is based on event and complex gateway. Connection object: There are mainly three types of connection gateway. They are sequence lines, association and message line. Swim lanes: These elements are usually used to organize flow activity they mainly include pools and lanes. Artifacts: They are used to provide additional information relating to the process. they are mainly three types they are Data objects, annotations and groups (van der Aalst 2016). Conclusion The conversion of the text to BPMN is usually implemented in order to focus on a diagrammatical representation of the data. This mainly helps in the understanding of the process and the flow of the data within the infrastructure of the conversion. References Dumas, P.E., 2016. Introduction. In Proslavery Britain (pp. 1-8). Palgrave Macmillan US. Kalenkova, A.A., van der Aalst, W.M., Lomazova, I.A. and Rubin, V.A., 2017. Process mining using BPMN: relating event logs and process models. Software Systems Modeling, 16(4), pp.1019-1048. Muthusamy, Vinod, et al. "Lessons learned using a process mining approach to analyze events from distributed applications." Proceedings of the 10th ACM International Conference on Distributed and Event-based Systems. ACM, 2016. van der Aalst, W., 2016. Process mining in the large. In Process Mining (pp. 353-385). Springer Berlin Heidelberg. van der Aalst, Wil MP. Process mining: data science in action. Springer, 2016.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.